Which location is the equipment allowed?
- The EMS, does it always have to go to the left side or is it allowed to go above the main branch terminal?
- Does the EMS need to go in the same metering field as the meter which feeds the in-line EMS?
- Does the PV breaker need to go into the metering field which the PV breaker is feeding or can it go in an empty metering field?